Showing posts with label BAE Systems. Show all posts
Showing posts with label BAE Systems. Show all posts

Wednesday, June 22, 2016

British Army's DEADLY WEAPON: BAE Systems Challenger 2 Mk. 2 Main Battle Tank | Full HD



Subscribe For More - MilitaryTiger
                    
SHARE this video on Facebook, Twitter, Instagram, Google+

○○○ Stay Tuned and Enjoy ○○○

Wednesday, February 12, 2014

17 Firms Vie To Supply Tank, Vehicles to Poland

Seventeen foreign and Polish defense companies have applied to participate in the technical dialogues to supply new light tanks and tracked infantry fighting vehicles to Poland’s Army.
 

The procurements are being carried out by the Polish Defense Ministry’s Armament Inspectorate.

The local companies include Polish Defense Holdings subsidiary OBRUM, PCO S.A., KenBIT, Huta Stalowa Wola, WB Electronics, Etronika, ZM Tarnow, IMS-Griffin, M.K. Szuster, Aycomm and Radiotechnika Marketing. Foreign manufacturers and their subsidiaries include the UK’s BAE Systems, France’s Nexter and Thales, Germany’s Rheinmetall and PSM Projekt System & Management, Rheinmetall’s joint venture with Krauss-Maffei Wegmann, and Sweden’s Saab.

The technical dialogue for the light tank program is expected to take about two months, and the prototype is scheduled for completion in 2016, local news site Defence24.pl reported. The Polish military is aiming to acquire about 300 tanks with a weight of up to 35 tons to replace the country’s outdated T-72s.Under the technical dialogue terms, the new infantry fighting vehicles are to be offered in a combat support and technical support variant, according to the Armament Inspectorate.

Tuesday, January 21, 2014

First Saudi Typhoon Aircraft Rolled Out


The Roll Out Ceremony for the first two Typhoon aircraft constructed for the c was held at BAE Systems' Warton site yesterday.

The ceremony, which was attended by the Saudi Assistant Minister of Defence and Aviation, His Royal Highness Prince Khalid Bin Sultan bin Abdul Aziz Al Saud, representing the Saudi Deputy Prime Minister and Minister of Defence and Aviation, His Royal Highness Crown Prince Sultan bin Abdul Aziz Al Saud, and the Minister for the Armed Forces, Mr Bill Rammell, representing the Secretary of State for Defence, included a fly past by one of the RSAF Typhoons.

This represents another significant stage in the progress of the Salam Project, which covers the supply of 72 Typhoon aircraft tothe Royal Saudi Air Force in accordance with the Understanding Document signed by both Governments.

The Minister for the Armed Forces, Bill Rammell, said:

"This ceremony is a very significant milestone for the Salam Project. The Royal Saudi Air Force is getting a fantastic aircraft. Typhoon is a world-class, multi-role aircraft and will provide the RSAF with the defence capability it needs to meet the defence challenges oftoday and for the foreseeable future.

"The industrial benefits of the Project are also substantial for both nations and will help to sustain several thousand, skilled jobs in the UK and Saudi Arabia over the next ten years."
Background Information

The Governments of Saudi Arabia and the UK signed a formal understanding in 1985 for the supply of Tornado IDS, Tornado ADV, Hawk and PC-9 aircraft, together with associated support services, equipment, weapons, ammunition and electronic warfare systems; the aircraft have all since been delivered.

The two governments signed a Memorandum of Understanding (MOU) in 1986 elaborating the arrangements put in place the previous year. This formalised the role of British Aerospace (BAe) (as it was called at the time) as the main contractorfor the whole programme, and established a UK Ministry of Defence (MOD) Project Office then within the Defence Export Services Organisation (DESO) to coordinate the activities of UK MOD in support of the programme, and to monitor the contracted activities of BAe. The two governments signed the "New Buy Tornado Agreement"for the supply of additional Tornado IDS aircraft in 1993.

On 21 December 2005 the then Secretary of State for Defence, Dr John Reid, signed an Understanding Document which was intended to establish a greater partnership in modernising the Saudi Arabian Armed Forces and develop close service-to-service contacts, especially through joint training and exercises. Under the terms of the document it was agreed that Typhoon aircraft would replace Tornado ADV aircraft and others currently in service withthe Royal Saudi Air Force. BAE Systems would also invest in local Saudi companies, develop an industrial technology plan, and provide suitable training for thousands of Saudi nationals providing through life support for key in-service equipments.
On 17 September 2007, the Governments of Saudi Arabia and the UK announced that agreement had been reached on the sale of 72 Typhoon aircraft. This new defence cooperation programme, which has been designated the Salam Project, will eventually be supported by substantial logistical and training packages. The final details of these support packages are still subject to further discussion between the Governments, but limited aircrew and technician training has already started inthe UK in preparation for the delivery of the first Typhoon aircraft to Saudi Arabia later this summer. The Roll-Out ceremony marks the beginning of the delivery stage of the Salam Project.

Role of UK MOD: The 1986 MOU requires the UK Government to ensure that all equipment, spares, training and technical work supplied by the main contractor (BAE Systems) are in accordance with Saudi requirements. This requirement will continue for the Salam Project. BAE Systems' performance in meeting requirements is monitored by the MoD's Director General Saudi Armed Forces Project (DGSAP) and his staff, based in London andSaudi Arabia.

Monday, August 5, 2013

P-8A Poseidon_A Backgrounder


Description & Purpose:



The P-8A Poseidon is a long-range anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft capable of broad-area, maritime and littoral operations.

A derivative of the Next-Generation 737-800, the P-8A combines superior performance and reliability with an advanced mission system that ensures maximum interoperability in the future battle space.

Customers:


The P-8A is being developed for the U.S. Navy by a Boeing-led industry team that consists of CFM International, Northrop Grumman, Raytheon, GE Aviation, BAE Systems and Spirit AeroSystems.

The U.S. Navy plans to purchase 117 P-8As to replace its fleet of P-3C aircraft. In January 2011, Boeing received a $1.6 billion contract for low-rate initial production of the first six aircraft, spares, logistics and training devices; in November 2011, Boeing received a $1.7 billion LRIP award for seven additional P-8As. In September 2012, Boeing received a $1.9 billion contract for 11 aircraft, bringing the total to 24. 

P-8A initial operational capability is slated for 2013.

On Jan. 1, 2009, Boeing signed a contract with the government of India to provide eight P-8I long-range maritime reconnaissance and anti-submarine warfare aircraft to the Indian navy. The P-8I is a derivative of the P-8A designed specifically for the Indian navy.

Australia signed an MOU with the U.S. Navy in 2009 and will collaborate in Increment 2. In March 2012, a production, sustainment and follow-on development MOU was signed.

General Characteristics: 

Propulsion:                         Two CFM56-7 engines providing 27,000 pounds thrust   each
Length:                                 129.5 feet (39.47 meters)  
Wing Span:                         123.6 feet (37.64 meters)
Height:                                 42.1 feet (12.83 meters)
Maximum Takeoff Gross Weight:     189,200 pounds (85,820 kilograms)
Speed:                                  490 knots (564 mi/h, 789 km/h)
Range:                                  1,200+ nautical miles, with 4 hours on station (1,381 miles, 2,222 kilometers)
Ceiling:                                41,000 feet (12,496 meters)
Crew:                                    9 

Boeing is using a first-in-industry production process and its existing Next-Generation 737 production system to efficiently design and build P-8 aircraft. The P-8’s 737-800 fuselage is built in Wichita, Kan., and then sent to Boeing’s final assembly facility in Renton, Wash., where all aircraft structural features unique to the P-8A are incorporated in sequence during fabrication and assembly. Aircraft quality and performance acceptance flight testing takes place at Renton Field and final installation and checkout of the mission system and special flight test instrumentation is conducted at Boeing Field.



The first test aircraft began U.S. Navy formal flight testing at Boeing Field in late 2009 and ferried to Naval Air Station Patuxent River, Md., on April 10, 2010, for completion of flight test. Six P-8A test aircraft currently are in flight test. Boeing’s first production P-8A made its initial flight July 7, 2011 and was officially delivered to the Navy March 4, 2012. Boeing completed the last if its LRIP-1 deliveries in January 2013

Background:


Boeing was awarded a $3.89 billion contract for the system development and demonstration (SDD) phase of the program on June 14, 2004. SDD activities include developing and integrating all the necessary software and onboard mission systems and developing training systems. The P-8A is expected to significantly transform how the Navy’s maritime patrol and reconnaissance force will train, operate and deploy.

The initial SDD contract included building five test vehicles: three flight test aircraft (T1, T2 and T3), one full-scale static test airframe and one full-scale fatigue test airframe (S1 and S2). The contract included an option for two additional test vehicles (T4 and T5), which has since been exercised. One additional flight test aircraft (T6) also was added to the contract.
In November 2005 the Navy announced that the P-8A preliminary design review (PDR) was the best major weapons system PDR it had ever reviewed. A successful critical design review was completed in July 2007.

The team started production on the first test aircraft on Dec. 11, 2007, at Spirit’s facility. Fuselage assemblies come together on Spirit’s existing Next-Generation 737 production line. Spirit delivered the first fuselage to Boeing in late March 2008 and final assembly of the aircraft began the same day in Renton, Wash. The P-8A made its first flight on April 25, 2009. Full-scale static testing of the P-8A’s airframe was completed in January 2011. The Navy has surpassed 2,800 flight-test hours in the P-8A test aircraft.

Industry Partners:


Boeing and its industry partners provide unrivaled expertise in both large-scale systems integration and network centric operations, plus unquestioned leadership in developing and customizing military and commercial products for maritime forces.

CFM International, a 50/50 joint company of Snecma Moteurs and General Electric Company, provides the CFM56-7 engines that power the P-8A. The two engines each provide 27,300 pounds of takeoff thrust. The CFM56-7 is one of the world’s most reliable engines. This fleet of engines has logged more than 30 million flight hours while maintaining an industry-leading .002 percent in-flight shut down rate per 1,000 hours of flight.

Northrop Grumman’s Electronic Systems sector provides the directional infrared countermeasures system, and the electronic support measures system. Northrop Grumman’s Aerospace Systems sector develops data links for P-8A; the company’s Integrated Systems sector supports the mission planning effort.

Raytheon provides the AN/APY-10 radar which delivers all weather, day/night multi-mission maritime, littoral and overland surveillance capabilities. Raytheon also provides the MK 54 lightweight torpedo.

GE Aviation supplies both the Flight Management and Stores Management systems on the P-8A. The Flight Management System provides an integrated open architecture that is CNS/ATM compatible along with an inherent growth path for upgrades. The Stores Management System provides a comprehensive system for the electronic control of integrated weapons management.

Spirit AeroSystems builds the 737 aircraft’s fuselage and airframe tail sections and struts in Wichita, Kan. Spirit supplies large component parts and assemblies for a number of Boeing commercial aircraft.

BAE Systems provides the mission computing and display system (MCDS), flight deck panels and data diode.