Indian authority arrested a constable of its border force BSF who was allegedly transferring sensitive information about national interests. ISI penetrated this member from inside and appointed him for money and other facilities, sources said.
Without an appropriate military power, a small state is on the mercy of neighboring big states; which senses its sovereignty is under threat..........
Tuesday, December 1, 2015
ISI Most Powerful Spy Agency in the World: Former RAW Chief
Saturday, October 24, 2015
India Has "Tactical Nuclear Weapons" (TNW) From The Very Beginning
Recently Pakistan complains that India possessed low-yield Tactical Nuclear Weapons from the very beginning and it tested the first TNW at Pokhran Ranges in 1998 test fire. This allegations come after India heavily complaining to the west against Pakistani TNWs and short-rangr battlefield Nasr (Vangeance-IX) missile systems.
Pakistani Authorities always claiming that they must use this battlefield nukes & Nasr missiles against any Indian aggression into its territories. After Modi's taking over of Delhi's power house Pakistan-India tensions are high and border-skirmishes increases in dangerous level.
Monday, September 7, 2015
While LCA Tejas failing did LCH would be an indigenous success story from HAL?
Hindustan Aeronautics has carried out hot-and-high flight testing with its Light Combat Helicopter (LCH).
The work took place recently from the northern Indian city of Leh, and saw the helicopter conducting flights at elevations ranging from 3200-4800m, says Hindustan Aeronautics (HAL).
Tests saw the aircraft operating “under extreme weather conditions at different altitudes.”
The aircraft involved was the third LCH prototype, designated TD-3, and temperatures experienced during the tests ranged from 13-27C. During the trials the helicopter was configured with a electro optical pod, rocket launchers, its 20mm cannon turret, and air-to-air missile launchers.
HAL adds that the LCH was able to take off and land at high altitudes carrying “reasonable amounts of weapons and fuel.”
Given India’s diverse geography, the LCH has been tested in a number of environments, including high-altitude cold weather conditions, sea level tropical conditions, and hot and dry conditions.
HAL expects to produce 179 examples for the Indian military, but the programme has suffered from delays.
With a maximum take-off weight of 5.8t, the LCH is a development of HAL's Dhruv advanced light helicopter. France's Turbomeca helped develop the helicopter's twin Shakti engines.
Key features include low observable characteristics, a glass cockpit, armour protection, crashworthiness and the ability to operate at night. Mission systems include a helmet-mounted sight, electronic warfare system, directional infrared countermeasure/laser transmitter, a datalink and an infrared suppressor.
According to HAL, the helicopter will be able to carry missiles for a variety of missions, including air-to-air, air-to-surface, and anti-radiation.
Tuesday, July 7, 2015
First JF-17 Export Order Will Boost Fighter's Market
![]() |
| Paris Air Show Pakistan's JF 17 Thunder Aircraft To Participate News 2015. |
The customer in question is believed to be Myanmar, and the head of the country’s Air Force, Gen. Khin Aung Myint, was in Pakistan at the end of May for a four-day visit at the invitation of the Pakistan Air Force. He met senior defense officials and toured various bases and installations, though little more was said about the trip at the time.
Details, such as cost and the number of aircraft involved, are not known, but deliveries are expected to commence in 2017, according to information made available by Air Commodore Khalid Mahmood, head of the Air Force’s sales and marketing effort for the aircraft type. When Defense News asked Mahmood if he thought potential customers would be encouraged by the deal, he was optimistic, but also realistic.
“However, it is difficult to give a timeline because there are many variables and mostly they depend on the customer countries. Sometimes it seems that the deal is around the corner but because of reasons like political instability in the country or in the neighborhood or for some other reasons, the timelines are pushed.
“So one is never sure unless the contract is inked,” he added.


